A

AIA CES Credits

AV Office

Abstract Publication

Academic Affairs

Academic Calendar, Columbia University

Academic Calendar, GSAPP

Admissions Office

Advanced Standing Waiver Form

Alumni Board

Alumni Office

Architecture Studio Lottery

Assistantships

Avery Library

Avery Review

Avery Shorts

S

STEM Designation

Satisfactory Academic Progress

Scholarships

Skill Trails

Student Affairs

Student Awards

Student Conduct

Student Council (All Programs)

Student Financial Services

Student Health Services at Columbia

Student Organization Handbook

Student Organizations

Student Services Center

Student Services Online (SSOL)

Student Work Online

Studio Culture Policy

Studio Procedures

Summer Workshops

Support GSAPP

Close
This website uses cookies as well as similar tools and technologies to understand visitors' experiences. By continuing to use this website, you consent to Columbia University's usage of cookies and similar technologies, in accordance with the Columbia University Website Cookie Notice Group 6
Red lubinsky mariaaceves marielaalfaro enriquecasas carlosmannarino abrahamtenenbaum sp26 capstone14

Timber Hub

Project by: John Kanakas Luna Christensen, Syed Asghar, Benjamin Garst, Hannah Zhao

The Timber Hub is a proposed 11-story, 56-unit mixed-income rental development at 3918 4th Avenue in Sunset Park, Brooklyn — a 7,517 SF corner lot two blocks from the 36th Street N/R/D subway station. Structured on a 99-year ground lease to eliminate land acquisition costs, the project leverages New York City’s City of Yes for Housing Opportunity initiative, unlocking a 5.01 FAR under the Universal Affordability Preference (UAP) bonus — up from a 4.0 base — by dedicating 30% of units as permanently affordable at 80% AMI. The building is designed around a mass timber structural system, reducing embodied carbon by 30–40% versus concrete and structural costs by approximately 20%, while creating distinctive biophilic interiors that support a 5–8% market rent premium. Ground-floor retail spanning 7,517 SF activates both street frontages, generating approximately $461,000 in annual revenue. The project qualifies for the 485-x property tax exemption — a 35-year abatement that materially reduces operating expenses and improves NOI. Initial underwriting indicates a levered IRR of 27.38%, LP IRR of 24.79%, and a stabilized value of $35.0M at a 5.0% cap rate, on a total project cost of $20.99M capitalized with a 65% LTC senior construction loan and $6.9M of equity.